We Convert Sites Into Tier III AI Facilities
We buy land, powered shells, and former mining sites and convert them into liquid-cooled Tier III data centers, then deploy our own compute and sell it to offtakers.
Acquire. Convert. Deploy. Offtake.
We own the full lifecycle, from the dirt and the power to the GPUs and the contract.
Acquire
We buy land, powered shells, and former mining sites, locations that already have power and structure, so we move faster than a ground-up build.
Convert
We retrofit each site into a liquid-cooled Tier III data center, power, cooling, and redundancy engineered by a team with hardened telco and construction roots.
Deploy
We install our own compute, Vera Rubin and GB300, into the facility, cooled and commissioned to power-on. We own the hardware, not just the building.
Offtake
We sell that compute to offtakers, dedicated capacity on term contracts, or on-demand GPUs, with revenue-generating capacity from the day the racks energize.
14 MW Live. 100 MW in the Pipeline.
Capacity energized this year, with a substantial pipeline in development, liquid-cooled, concurrently maintainable, and running our own compute.
Liquid-cooled Tier III capacity energized and running our own compute.
Contracted and in development, energizing as we convert and build out sites.
Vera Rubin and GB300 systems on order, installing across our facilities.
Purpose-Built for Liquid-Cooled AI
Immersion and direct-to-chip cooling, redundant power, and dense compute, engineered into every facility we operate.
Immersion & liquid cooling
Liquid-cooled data hall
Power distribution
Cooling plant
Facility exterior
Compute in operationWhy Our Facilities Hold Up
We come from hardened telco and construction, uptime, power, and buildout are the disciplines we were built on.
Tier III Operated
Concurrently maintainable power and cooling with redundant paths, run by operators, not landlords.
Liquid Cooling
Purpose-built for the thermal density of Vera Rubin and GB300 rack-scale systems.
Telco-Hardened Roots
A team from hardened telco and construction backgrounds, uptime and buildout are in our DNA.
Secure & Compliant
Physical security, access control, and full U.S. export-control compliance on the compute we run.
Have a Site, or Need Capacity?
Bring us land, a powered shell, or a mining site, or reserve compute in a facility we already run. Either way, let's talk.